切换到宽版
  • 1082阅读
  • 0回复

硕士论文-BJORN GJORV-Well control procedures for extended reach wells-pdf [复制链接]

上一主题 下一主题
离线norwaychen
 
发帖
99
财富
365
威望
23
交易币
0
只看楼主 倒序阅读 使用道具 0楼 发表于: 2007-11-16 | 石油求职招聘就上: 阿果石油英才网
— 本帖被 floater 从 教程文档 移动到本区(2008-07-04) —
【论文题目】Well control procedures for extended reach wells
【论文作者】BJORN GJORV
【院校】  Texas A&M University
【时间】  August 2003
【内容简介】  The limits of directional drilling continue to be pushed back as horizontal or near-horizontal reservoir sections are being drilled, cased, cemented and completed to tap reserves at extreme distances. Continuous development of new technology and adopting a technical-limit approach to performance delivery are key elements for the success and further development of extended-reach drilling projects. For this study a two-phase well control simulator was used to evaluate different kick scenarios that are likely to occur in extended-reach wells. An extensive simulation study covering a vide range of variables has been performed. Based on this investigation together with a literature review, well-control procedures have been developed for extended-reach wells. The most important procedures are as follows: Perform a "hard" shut-in when a kick is detected and confirmed. Record the pressures and pit gain, and start to circulate immediately using the Driller's Method. Start circulating with a high kill rate to remove the gas from the horizontal section. Slow down the kill circulation rate to 1/2 to 1/3 of normal drilling rate when the choke pressure starts to increase rapidly. The simulator has been used to validate the procedures.
【目录】
ABSTRACT ..................................................................................................................... iii
DEDICATION.................................................................................................................. iv
ACKNOWLEDGMENTS................................................................................................. v
TABLE OF CONTENTS ................................................................................................. vi
LIST OF TABLES............................................................................................................ ix
LIST OF FIGURES........................................................................................................... x
INTRODUCTION............................................................................................................. 1
Introduction to Extended Reach Drilling (ERD)............................................................ 1
BP's Wytch Farm oilfield ............................................................................................... 2
Well-control challenges in ERD wells ........................................................................... 3
Simulating wellbore pressures during a kill procedure .................................................. 5
WELL CONTROL METHODS........................................................................................ 6
Introduction .................................................................................................................... 6
Kick causes ..................................................................................................................... 7
Kick detection and verification....................................................................................... 9
Shut-in procedures ........................................................................................................ 10
Circulation kill techniques and procedures .................................................................. 11
OBJECTIVES AND PROCEDURES............................................................................. 13
Research objectives ...................................................................................................... 13
Procedures .................................................................................................................... 13
TWO-PHASE WELL CONTROL SIMULATOR.......................................................... 14
Description of the simulator ......................................................................................... 14
Simulator input ............................................................................................................. 14
Simulator output ........................................................................................................... 16
Simulation procedures .................................................................................................. 18
SIMULATION RESULTS FOR THE EXTENDED REACH WELLS ......................... 19
Effect of varying kick sizes and true vertical depth ..................................................... 19
Introduction ................................................................................................................ 19
Discussion of the results............................................................................................. 19
Effect of varying water depth and kick size ................................................................. 21
Introduction ................................................................................................................ 21
Discussion of the results............................................................................................. 22
Effect of varying kick sizes and circulation rates for different hole sizes.................... 24
Introduction ................................................................................................................ 24
Discussion of the results............................................................................................. 25
Effect of varying kick intensity for different water depths .......................................... 30
Introduction ................................................................................................................ 30
Discussion of the results............................................................................................. 31
GAS REMOVAL IN HIGHLY INCLINED AND HORIZONTAL WELLBORES...... 32
Introduction .................................................................................................................. 32
Recommendations for gas removal in ERD wells........................................................ 32
SUMMARY, CONCLUSIONS AND RECOMMENDATIONS ................................... 34
Introduction .................................................................................................................. 34
Effect of kick size......................................................................................................... 34
Effect of water depth .................................................................................................... 34
Effect of circulation kill rate......................................................................................... 35
Effect of hole size......................................................................................................... 35
Effect of kick intensity ................................................................................................. 35
Recommendations for well control procedures in ERD wells ..................................... 35
Recommendations for future work ............................................................................... 36
NOMENCLATURE........................................................................................................ 37
REFERENCES................................................................................................................ 38
APPENDIX A: PLANNING A KILL............................................................................. 42
APPENDIX B: WELL CONTROL COMPLICATIONS ............................................... 46
APPENDIX C: CONVERSION OF ANNULAR VELOCITY TO FLOW RATE ....... 50
VITA............................................................................................................................... 51
附件: WELL CONTROL PROCEDURES FOR EXTENDED REACH WELLS.rar (654 K) 下载次数:8 ,你所在用户组没有附件下载权限 VIP会员免积分下载 ,该附件已加密,拥有2威望才能下载
1条评分
起舞弄清影 财富 +30 优秀英文论文 2007-11-16
评价一下你浏览此帖子的感受

精彩

感动

搞笑

开心

愤怒

无聊

灌水
HAVE A FUN & MOVE ON~~

网站事务咨询:QQ:1392013 | 26189883
阿果石油网为免费个人网站,为石油人提供免费的在线即时技术交流场所,拒绝任何人以任何形式在本论坛发表与中华人民共和国法律相抵触的言论和行为!
如有言论或会员共享的资料涉及到您的权益,请立即通知网站管理员,本站将在第一时间给予配合处理,谢谢!