Pick up hammer to rig floor and R/Up same and stovepipe handling
equipment.
PJSM on picking and driving stovepipe.
P/up and RIH 30" stovepipe shoe joint. PU & R/up drive sub. Attempted to
seat drive sub into square shoulder of stove pipe box - Dril-Quip drive sub
unable to reach the square shoulder (Max. OD of drive sub too big to reach
square shoulder on Stove pipe box).
这句里的stovepipe是不是就是指的导管,还有same这么解释,经常在报表里看到,