DEEP OFFSHORE TECHNOLOGY International Conference & Exhibition November 28 – 30, 2006
George R. Brown Convention Center
Houston, Texas USA
SHOW REPORT The 18th Deep Offshore Technology International (DOT) Conference & Exhibition held in Houston, Texas, USA, 28 - 30 November, 2006 attracted a record total of 3,255, trade visitors and conference delegates from 39 countries around the world. Exhibitors and conference delegates alike praised this year’s event as the best in years in terms of quality visitors and choice of conference subjects.
Technical Conference
As it has in past years, the DOT technical program served as the major highlight of the conference. The sessions coveredall areas of deepwater E & P technology。
including Floating Facilities, Subsea Technology, Well Construction, Field Development, Drilling Rigs and Equipment, Subsea Processing, Construction and Installation, Intervention, Flow Assurance, Completion Design in Deepwater, Riser Technology, Lessons Learned, Advanced Materials and Welding Processes, High-Pressure/High-Temperature, Flowlines and Pipelines, Risk and Reliability, Model Testing and Response Prediction, and Station-keeping and Mooring. 国际深水海洋开发技术会议于2006年10月28-30日在美国休斯顿举行,有39个国家3255位代表参加,中国派出8人的代表团出席了会议。目前,海洋石油开采已经向深水领域发展,开发我们的深水技术具有深远的意义,这本论文集提供了很好的参考价值。
本论文集一共收录了98篇论文,涉及深水技术的各个领域,全为PDF格式。(现有时间,现果友分享!)
文件目录:(按楼层数) 中文:(只是为了方便,用灵格斯译的,没有修改!) 1比较评估的晶石,张力腿平台和浮动利率债券的深水Semisubmersible应用。 PDF格式
2模数转换器研究-多用途货船-评估的需求干预船只的深水油气田海上安哥拉。 PDF格式
3先进的风险减少技术的深水资产纳入无内胎泄压阀。 PDF格式
4晚期土壤模拟沙特遥感中心全球分析。 PDF格式
5资产完整性管理计划TLPs ,考虑到Hurricanes.pdf
6调查耐久性聚酯绳深水Moorings.pdf
7评估的解舒的HFI管线。 PDF格式
8自治区海底检查“让理想变为现实。 ” PDF格式
9束混合胶印冒口热性能测试,与此同时Project.pdf
10计算极限非线性冒口响应。 PDF格式
11计算基于可靠性的安全因素建立缺陷验收标准深水冒口焊缝。 PDF格式
12个案研究BP的深水分配组生产分配软件甄选过程。 PDF格式
13概念发展semisubmersible钢悬链线立管的深水域和严厉environments.pdf
14考虑深水完成硬件设计-液压驱动系统的砂控制应用。 PDF格式
15宪法和提康德罗加项目发展Overview.pdf
16宪法晶石交通挑战和解决办法。 PDF格式
17转换单壳函数f (规划)的SO的挑战检查,维修,保养.. PDF格式
18裂纹重新定性和可塑性的影响冒口和流非洲。 PDF格式
19深水铺管在恶劣的环境。 PDF格式
20深水遥控焊接技术pieline修理和热tapping.pdf
21 Deepstar深水技术需求在未来10 Years.pdf
22深水油田开发系统的兼容访问垂直提升。 PDF格式
23设计与制作的高温高压晶闸管Systems.pdf
24设计浮力罐疲劳和安装。 PDF格式
25详情水合物管理深水海底天然气开发。 PDF格式
26开发一个深水斯利姆口径钻孔井口和通过横向树实现井施工Savings.pdf
27开发和安装一个新的一代外冒口系统阿纳达科宪法晶石。 PDF格式
28Disconnectable转塔式系泊FPSOs -一种可靠的深水浮式生产系统的墨西哥湾。 PDF格式
29评价研究的控制标题炮塔系泊浮式生产储油船在巴西水域。 PDF格式
30经验深水流和可控硅起爆使用“连接奠定客场法” 。 PDF格式
31经验高温高压海底HIPPS对克莉丝汀。 PDF格式
32推广深水提升疲劳寿命使用镍基焊接CONSUMABLES.pdf
33极端波浪对深水TLPs教训Snorre模型试验。 PDF格式
34从井筒与超越验证电除尘器技术在Seabed.pdf
35全面的数据比较红鹰细胞晶石在飓风丽塔和回路电流Ulysses.pdf
36稠油产量从深水领域,如何提升和保证流量。 PDF格式
37高压软管,下Frontier.pdf
38改进的自动超声波检测的深海洋Applications.pdf
39安装轻便深水脐强电流不平衡seabed.pdf
40安装SmartWell完成深水墨西哥湾的小的独立代理商-创新,项目管理和吸取的经验教训。 PDF格式
41积分扶正小组,并加强与阻力计算力矩提高套管安装。 PDF格式
42焊接方法管的管安装塑料衬里管道。 PDF格式
43深水大直径管道修复系统。 PDF格式
44经验教训的设计和安装的吸力桩在西非。 PDF格式
45经验教训安装锚固和系泊系统深水FPSOs 。 PDF格式
46经验教训的安装硬质大型管道运动员在本格拉伯利兹场。 PDF格式
(缺)
英文: 1A Comparative Assessment of Spar, Tension Leg Platform and Semisubmersible Floaters for Deepwater Applications .PDF
2ADC study - Multi-Purpose Vessels - Evaluation of the demand for intervention vessels on the deepwater hydrocarbon fields offshore Angola .pdf
3Advanced Risk Reduction Technology for Deepwater Assets incorporating Tubeless Pressure Relief Valves .pdf
4ADVANCED SOIL MODELING FOR SCRS GLOBAL ANALYSIS .pdf
5An Asset Integrity Management Program for TLPs that Takes Into Account Hurricanes.pdf
6An Investigation into the Durability of Polyester Ropes for Deepwater Moorings.pdf
7Assessment of the Reelability of HFI Linepipe .pdf
8Autonomous Subsea Inspection “Making the Vision a Reality”.pdf
9Bundle Hybrid Offset Riser thermal performance test on ROSA Project.pdf
10Calculation of Extreme Nonlinear Riser Response .pdf
11Calculation of Reliability-Based Safety Factors for Establishing Defect Acceptance Criteria for Deepwater Riser Welds .pdf
12Case Study of BP’s Deepwater Allocation Group Production Allocation Software Selection Process .pdf
13Concept development of a semisubmersible with steel catenary risers for deep waters and harsh environments.pdf
14Considerations for Deepwater Completions Hardware Design - Hydraulic Actuated Systems in Sand Control Applications .pdf
15Constitution and Ticonderoga Projects Development Overview.pdf
16CONSTITUTION SPAR TRANSPORTATION CHALLENGES AND SOLUTIONS .pdf
17Converted Single Hull F(P)SO Challenges regarding Inspection, Repair, and Maintenance..pdf
18Crack Re-characterization and Plasticity Effects on Riser and Flowline ECA .pdf
19DEEP WATER PIPELAY IN HARSH ENVIRONMENT .pdf
20Deep water remote welding technology for pieline repair and hot-tapping.pdf
21Deepstar Deepwater technology Needs over the Next 10 Years.pdf
22Deepwater Field Development Systems with Compliant Vertical Access Risers .pdf
23Design and Fabrication of HPHT SCR Systems.pdf
24DESIGN OF BUOYANCY CANS FOR FATIGUE AND INSTALLATION .pdf
25Details of Hydrate Management in Deepwater Subsea Gas Developments .pdf
26Developing a Deepwater Slim-bore Wellhead and Drill Through Horizontal Tree to Achieve Well Construction Savings.pdf
27Development and Installation of a new generation outer riser system on Anadarko’s Constitution spar .pdf
28Disconnectable Turret-Moored FPSOs – A Reliable Deepwater Floating Production System for the Gulf of Mexico .pdf
29EVALUATION STUDY FOR THE CONTROL OF THE HEADING OF A TURRET-MOORED FPSO IN BRAZILIAN WATERS .pdf
30Experience with Deepwater Flowline and SCR Initiation Using the “Connect and Lay Away Method” .pdf
31EXPERIENCE WITH HPHT SUBSEA HIPPS ON KRISTIN .pdf
32EXTENSION OF DEEPWATER RISER FATIGUE LIFE THROUGH USE OF NICKEL BASED WELDING CONSUMABLES.pdf
33Extreme Wave Effects on Deep Water TLPs Lessons Learned from the Snorre A Model Tests .pdf
34From the Wellbore and Beyond- Proven ESP Technology on the Seabed.pdf
35Full Scale Data Comparison for the Red Hawk Cell Spar in Hurricane Rita and Loop Current Ulysses.pdf
36Heavy oil production from deepwater fields- How to lift and assure flow .pdf
37High Pressure Flexible Pipe, The next Frontier.pdf
38Improved Automated Ultrasonic Testing for Deep Offshore Applications.pdf
39Installation of lightweight deepwater umbilical in strong current on uneven seabed.pdf
40Installation of SmartWell Completions in Deepwater GoM by Small Independent Operator – Innovations, Project Management, and Lessons Learned .pdf
41Integral Centralizer Sub and Enhanced Torque and Drag Calculations Improve Casing Installation .pdf
42Jointing method for pipe-by-pipe Installation of plastic lined pipelines .pdf
43LARGE DIAMETER DEEPWATER PIPELINE REPAIR SYSTEM .pdf
44Lessons Learned from the Design and Installation of Suction Piles in West Africa .pdf
45Lessons Learned from the Installation of Anchoring and Mooring Systems for Deep Water FPSOs .pdf
46Lessons Learned from the Installation of the Large Rigid Pipeline Jumpers at the Benguela Belize Field .pdf
47LESSONS LEARNED FROM THE TOWING AND INSTALLATION OF DEEPWATER'S FPSO .pdf
48Models tests simulating catenary riser-soil interaction .pdf
49New Generation Acoustic Positioning & Communications System .pdf
50New Knowledge in Prediction of Air-Gap and Deck Impact on Offshore Platforms in Extreme Environments .pdf
51New Prospects in Development of Aluminum Ultra Deepwater Risers .pdf
52Non-Intrusive Pipeline Inspection Techniques for Accurate Measurement of Pipeline Contents within Operational Pipelines .pdf
53Norne Satellites – A unique and ambitious solution.pdf
54Offshore Deck Mating onto a Pre-Installed Semi-submersible by Means of a Self-propelled Heavy Transport Vessel .pdf
55Offshore War Room for Final Commissioning and Start-up Lessons Learned from Successful Implementation of Integrated Planning and Control Processes .pdf
56Online monitoring of gas well performance, what is available and what's required to be prepared for up to 15,000 feet water depth.pdf
57Operational Experience with disconnectable FPSO and subsea pumps .pdf
58OPTIMISATION OF PIPELINE PERFORMANCE BY JET TRENCHING TECHNIQUES .pdf
59Produced Water Treatment Using a New Continuous Coalescing Element – Technical Updates from the Field .pdf
60QUALIFICATION OF THE INCONEL FIELD JOINT FOR J-LAY INSTALLATION OF PLASTIC LINED FLOWLINES.pdf
61RAISING THE BAR FOR REMOTE INTERVENTION OPERATIONS .pdf
62Real-Time Monitoring for the Prevention of Hydrate Plugging.pdf
63REDUCING ERRORS THAT LEAD TO UNCERTAINTIES IN THERMAL CONDUCTIVITY MEASUREMENT .pdf
64Review and Evaluation of Riser Integrity Monitoring Systems and Data Processing Methods .pdf
65Riser Tower Design for Operation with a Turret Moored FPSO.pdf
66Riser-less Tubing Plug Recovery Provides the Key to Efficient Tree on Wire Installations in Deepwaters .pdf
67Robust Design of a Truss Spar for Deepwater Field Development .pdf
68Robust SCR Design Against Fatigue in Deepwater Harsh Environments.pdf
69ROV Based Opening of FBIV .pdf
70Saving Rig Time in Deepwater Environments Utilizing New Completion Technology.pdf
71SCR Self-installation from an FPU using Mechanical Connectors .pdf
72Seabed to Surface in an Arctic Environment.pdf
73Selecting Cost Optimal Completion Systems for Deepwater Developments .pdf
74Significant improvement of deepwater field economics by use of New Integrated Well Systems- 7in completions with downhole (Smart) capabilities inside 13-0.5 in wellheads.pdf
75STEEL CATENARY RISER INSTALLATION ON FPSO .pdf
76Steel Catenary Riser Pull-in at Thunder Horse .pdf
77Study for the Conversion of a 3rd Generation Drilling Rig to Operate in 2,400 m of Water Depth.pdf
78Submarine Fiber Optic and DC power solutions for Ultra-Long Tiebacks .pdf
79Subsea Boosting Technology Evolution of Subsea oil boosting to lead Subsea gas compression .pdf
80Subsea Heat Bank – The Next Level of Subsea Insulation Systems .pdf
81Subsea Processing – Challenges and Opportunities .pdf
82Subsea slug catchers provide flexibility deepwater field developments.pdf
83Subsea Tree Design- A fresh approach.pdf
84SUBSEA WELL TIE BACK USING SHORT FLEXIBLE JUMPERS – ENGINEERING, SYSTEM INTEGRATION TESTS AND INSTALLATION METHODS OF A SUCCESSFUL CAMPAIGN .pdf
85Successful Low Contamination Formation Sample Acquisition in High Pressure Differential Reservoirs in Gulf of Mexico. .pdf
86Technical and Commercial Influences of Jumper Connectors with Emphasis on Decision Methodology .pdf
87The Balance between Risk and Reliability For Deepwater Gulf of Mexico Production Systems .pdf
88The Development of an Effective Risk Management Strategy for a FPSO Disconnectable Turret Mooring Design .pdf
89THE DYNAMICS OF FLEXIBLE JUMPERS CONNECTING A TURRET MOORED FPSO TO A HYBRID RISER TOWER .pdf
90The future for deepwater rig day rates.pdf
91The Inherent Safe Design of an Offshore Installation – A Leap of Faith .pdf
92Today and Tomorrow- The Continuing Evolution of Subsea Boosting Technology .pdf
93Torsional Problems for Deepwater Mooring Lines .pdf
94Two New Deepwater Construction and Pipelay Vessels.pdf
95Ultra Deepwater Riser Interference Analysis by Using a Time Domain Simulation Approach with VIV Effect.pdf
96VIV Suppression Performance of Tail-Fin Fairings for Drilling Risers.pdf
97West Africa FPSO’s, a design perspective .pdf 累呀!目录编好了!文件上传可能就慢些!上传顺序不一定与上相同,但基本是一致的![ 此贴被diego在2009-07-22 23:09重新编辑 ]