We have a frac job at TVD3500m that have not perforated yet, while there was a deeper production formation that have produced for some years, and have pressure gradient as low as 0.5 SG, for protecting the lower formation from damagingby workover fluid, we would like to find some downhole tool that have combination function of bridge plug and check valve, that will hold the pressure form upper wellbore while fracing, as well as permit wash out proppant after job(the lower formation pressure was too low to allow circulation), and still can permit lower production formation to supply fluid while upper formation depleted.
so if there is any downhole tool or assembly that an withstand those job reliably? Thx