Title When and Where Relative Permeability Modification Water-Shutoff Treatments Can Be Successfully Applied 
  Author R.D. Sydansk, SPE, Sydansk Consulting Services, and R.S. Seright, SPE, New Mexico Petroleum Recovery Research Center 
  SPE  99371-MS  2006 
[ 此贴被笑韵在2008-02-26 12:54重新编辑 ]
评价一下你浏览此帖子的感受

精彩

感动

搞笑

开心

愤怒

无聊

灌水
离线笑韵
发帖
4043
财富
11582
威望
878
交易币
0
只看该作者 1楼 发表于: 2008-01-20 | 石油求职招聘就上: 阿果石油英才网
Paper Number  99371-MS
DOI  What's this? 10.2118/99371-MS
Title When and Where Relative Permeability Modification Water-Shutoff Treatments Can Be Successfully Applied 
Authors R.D. Sydansk, SPE, Sydansk Consulting Services, and R.S. Seright, SPE, New Mexico Petroleum Recovery Research Center

Source SPE/DOE Symposium on Improved Oil Recovery, 22-26 April 2006, Tulsa, Oklahoma, USA

Copyright 2006. Society of Petroleum Engineers 
Preview Abstract

This paper provides guidance on when and where relative-permeabiliy-modification/disproportionate-permeability-reduction (RPM/DPR) water-shutoff (WSO) treatments can be successfully applied for use in either oil or gas production wells. When properly designed and executed, these treatments can be successfully applied to a limited range of oilfield excessive-water-production problems. When these treatments are applicable, they may be placed using bullhead injection (not requiring mechanical zone isolation)—a very favorable feature. However, there are a substantial number of limitations and possible pitfalls relating to the successful application of RPM/DPR WSO treatments. First-time application by an inexperienced operator should be considered a somewhat high-risk undertaking. In order to successfully treat unfractured production wells (i.e., radial flow through matrix rock into the well) that are fully drawn down, the oil and water zones should not be in pressure communication and the oil-producing zone(s) must be producing at 100% oil cut (dry oil). When treating unfractured and multi-zoned production wells that are not fully drawn down, the well’s long-term oil-production rate can be increased if the post-treatment drawdown is increased substantially. Treatments that promote short-term (transient) decreased water/oil ratios can, in principle, be applied to many unfractured production wells (that are not totally watered out) in matrix rock reservoirs. However, these latter treatments must be custom designed and engineered on a well-by-well basis. Furthermore, for most wells, the performance and the economics of such transient WSO treatments are generally marginal. An attractive application of RPM/DPR WSO treatments is the use of robust pore-filling gels in the matrix reservoir rock that is adjacent to a fracture(s) when oil and water is being co-produced into the treated fracture.
本主题包含附件,请 登录 后查看, 或者 注册 成为会员
久违了的
离线hiyouer
发帖
298
财富
358
威望
15
交易币
0
只看该作者 2楼 发表于: 2008-09-04 | 石油求职招聘就上: 阿果石油英才网
Re:SPE  99371-MS
..这里只要一个财富。。

网站事务咨询:QQ:1392013 | 26189883
阿果石油网为免费个人网站,为石油人提供免费的在线即时技术交流场所,拒绝任何人以任何形式在本论坛发表与中华人民共和国法律相抵触的言论和行为!
如有言论或会员共享的资料涉及到您的权益,请立即通知网站管理员,本站将在第一时间给予配合处理,谢谢!