切换到宽版
  • 113阅读
  • 1回复

SPE 97168,25756,26525,72308,78186 [复制链接]

上一主题 下一主题
离线dream913
 
发帖
29
财富
22
威望
2
交易币
0
只看楼主 倒序阅读 使用道具 0楼 发表于: 2008-06-11 | 石油求职招聘就上: 阿果石油英才网
— 本帖被 笑韵 从 资料上传 移动到本区(2008-06-17) —
SPE 97168
New API Practices for Isolating Potential Flow Zones During Drilling and
Cementing Operations
M. Bannerman, Chevron; J. Calvert, Consultant; T. Griffin, Griffin Cement Consulting LLC; J. Levine and J. McCarroll,
MMS; D. Postler, Devon Energy; A. Radford, API; and R. Sweatman, Halliburton
Copyright 2005, Society of Petroleum Engineers
----------------------------------
Title Challenges for Monitoring and Verification of Drill Cuttings Reinjection Performance 
  Author Ahmed S. Abou-Sayed, Quanxin Guo, Gary Wang, John D. McLennan, Karim Zaki, Advantek International, Houston, Texas, USA 
  SPE  78186-MS  2002 

Title Design Considerations in Drill Cuttings Re-Injection Through Downhole Fracturing 
  Author Ahmed S. Abou-Sayed, Quanxin Guo, Advantek International 
  SPE  72308-MS  2001 

Title Field Application of Hydraulic Impedance Testing for Fracture Measurement 
  Author Paige, R.W., Murray, L.R., Roberts, J.D.M., BP Exploration 
  SPE  26525-PA  1995 

Title Fracture Mechanics Issues Relating to Cuttings Re-Injection at Shallow Depth 
  Author Willson, S.M., Rylance, Martyn, Last, N.C., BP Exploration 
  SPE  25756-MS  1993 
[ 此贴被笑韵在2008-06-12 16:31重新编辑 ]
本主题包含附件,请 登录 后查看, 或者 注册 成为会员
评价一下你浏览此帖子的感受

精彩

感动

搞笑

开心

愤怒

无聊

灌水
离线wm345748125
发帖
108
财富
231
威望
10
交易币
0
只看该作者 1楼 发表于: 2008-06-11 | 石油求职招聘就上: 阿果石油英才网
我也发几个,呵呵,都是水平井的
本主题包含附件,请 登录 后查看, 或者 注册 成为会员

网站事务咨询:QQ:1392013 | 26189883
阿果石油网为免费个人网站,为石油人提供免费的在线即时技术交流场所,拒绝任何人以任何形式在本论坛发表与中华人民共和国法律相抵触的言论和行为!
如有言论或会员共享的资料涉及到您的权益,请立即通知网站管理员,本站将在第一时间给予配合处理,谢谢!