Run in hole (RIH)
Pull outof hole (POOH)
Nipple up(N/U)
Rig up (R/U)
Rig down(R/D)
Make up (M/U)
Pick up (P/U)
Back off(B/O)
Slack off(S/O)
Crossover(X/O)
Blockoutpreventer (BOP)
Subsurfacesafety valve (SSSV)
Slidingside door (SSD) = Sliding sleeve
Plug backtotal depth (PBTD)
Totalvertical depth (TVD)
Measureddepth (MD)
Measurementswhile drilling (MWD)
Loggingwhile drilling (LWD)
Seismicwhile drilling (SWD)
Drillcollar (DC)
Drillpipe (DP)
High walldrill pipe (HWDP)
Kick offpoint (KOP)
Rotationkelly bushing (RKB)
Wearbushing (WB)
Casing (CSG)
Tubing (TBG)
High ratewater pack (HRWP)
Wire line(W/L)
Electricalsubmersible pump (ESP)
Shut-intree pressure (SITP)
Emergencyshut down (ESD)
Outsidediameter (OD)
Insidediameter (ID)
Expandablesand screen (ESS)
Horsepower (HP)
Thru-tubinginflatable permanent cement retainers (TTIPCR)